Public comments and policy materials
Public comments, evidence briefs, and proposed policy protections on the Arbor Hills Landfill, prepared by Trisha Kunst, a resident living less than one mile from the proposed expansion border. These materials express the author's views. The underlying regulatory records, datasets, and data visualizations are maintained separately at Arbor Hills Monitor.
Take action now
Write your commissioners →
Send a letter to the county commissioners and state legislators, straight from your own email, in one click.
Now published
Proposed minimum siting protections →
Three elevated-temperature protections a resident is asking the county to write into the Materials Management Plan's minimum siting criteria.
-
On the Materials Management Plan minimum siting requirements. Submitted to the Washtenaw County Materials Management Planning Committee, August 19, 2026.
-
Delivered in person to the Washtenaw County Board of Commissioners, the body that gives final approval to the Materials Management Plan, asking the county to retain an independent expert to help set the minimum siting criteria before any expansion. September 2, 2026.
-
To Michigan EGLE on the draft renewal of the Arbor Hills Energy air permit (SRN N1504, the landfill-gas turbine plant): make the plant demonstrate on every run that its fuel meets the sulfur limit, rather than relying on monthly sampling and controls housed in another operator's plan. September 6, 2026.
-
Delivered to the Washtenaw County Materials Management Planning Committee, asking the county to write three elevated-temperature protections into the Materials Management Plan's minimum siting criteria for any new or expanded landfill. September 9, 2026.
-
A resident-assembled brief on the subsurface elevated-temperature record at Arbor Hills, drawing on the operator's own EGLE-filed readings and the published literature.
-
A textual and structural analysis explaining why county minimum siting criteria may extend beyond geography, how EGLE must apply the applicable MMP during permit and license review, and where county planning authority ends and state regulatory authority begins.
Regulatory records, downloadable datasets, and data visualizations for Arbor Hills are maintained separately at
Arbor Hills Monitor. The Monitor's datasets and code are reproducible; the comments and policy requests on this page are advocacy prepared by a resident.